Location        : Alstom Wolverton Depot

 

Fleet               : Dockland Light Railway

 

Project           : Repaint externals of the carriages with new livery.

 

Specialist Compliant Coatings Ltd have changed the livery on the DLR within a very short turn around time, 48 hours from start to completion. The paint system specified by the customer was 3M EA9 WB Primer, followed by two applications of 3M Dicol.  This is a water-borne environmentaly system giving very low VOC's. The spray applied waterborne protective coating system is very durable, has a high levels of gloss retention, has good resistance to impact and abrasion.

 

SCC have experienced and conscientious personnel committed to providing a first class job at a competitive price. SCC provide COSHH assessments, Risk assessments, written instruction on each job and can also provide application reports to ensure total quality control.